Production Planning and Detailed Scheduling (PP/DS)
Purpose:
You use the Production Planning and Detailed Scheduling (PP/DS) component:
- To create procurement proposals for in-house production or external procurement to cover product requirements
- To optimize and plan the resource schedule and the order dates/times in detail.
You can take the resource and component availability into account here. Above all, PP/DS is used to plan critical products, such as products with long replenishment lead times or products that are produced on bottleneck resources. You can use PP/DS to create executable production plans and:
- Reduce lead times
- Increase on-time delivery performance
- Increase the throughput of products and reduce the stock costs, through better coordination of resources, production, and procurement.
Integration:
You can use PP/DS with other SAP APO components and with OLTP systems. With Demand Planning (DP), for example, you create a demand plan and transfer the planned independent requirements to PP/DS. With PP/DS, you create the procurement proposals to cover these requirements.
You transfer the planning-relevant data such as master and transaction data (for example, sales orders and stocks) from an OLTP system to SAP APO. You plan the critical products in SAP APO and transfer the planning results to the OLTP system. In the OLTP system, you execute order processing for manufacturing orders and, if necessary, plan the uncritical products. You manage the stocks here too.
Integration of PP/DS with other SAP APO components and an
OLTP system
Activity
|
Procedure
|
Other Information
|
Create master data
|
You transfer the master data from the OLTP system and complete the master data in SAP APO.
|
The OLTP system provides PP/DS with master and transaction data.
|
Process the Supply Chain Model
|
Use the Supply Chain Engineer (SCE)
|
In the SCE, you assign locations, products, resources, and production process models (PPM) to a model.
|
Make planned independent requirements from DP available to PP/DS
|
Release the Demand Plan to Supply Network Planning (SNP)
|
Requirements that fall within the PP/DS horizon and thus the planning responsibility of PP/DS, are transferred automatically to PP/DS when the demand plan is released.
|
Transfer SNP procurement proposals to PP/DS
|
Convert the SNP procurement proposals on the PP/DS horizon into PP/DS orders
|
You can also convert SNP orders that are outside the PP/DS horizon.
|
Carry out an availability check in the sales order ( Global ATP) and trigger procurement in PP/DS, if necessary
|
You use the following processes:
· Capable-to-Promise (CTP) · Multilevel ATP check |
|
Display exceptional, unexpected, or critical situations in the PP/DS planning process
|
Access the alert monitor
|
You can define which alerts you would like the system to generate and display.
|
Execute manufacturing orders
|
Use the execution functions in the connected OLTP system
|
Here you execute confirmations or goods receipt postings.
|
Features
- PP planning procedures
- Production planning run
- Interactive planning
- Detailed Scheduling
- Heuristics
- Optimization
- Pegging